Learners are currently undertaking assessment examination for term two and shall break off for holidays this month on the 14th of August 2026 for three weeks and shall return for term three mid- September 2026.
The Bill O’Connell classroom block roofing progressed well with support of the funds we received especially the addition to original BOQ where the material for roofing changed from timber to steel sections. The work has been a little slow because of frequent power shut downs that affected welding. However, all roofing materials were mobilized and are on site. Small bits of welding are being concluded and soon the ceiling work and iron sheets shall be placed on the building. The water tanks stands have also been completed and soon the tanks shall be installed. Another small delay shall be construction of parapet wall that requires to be completed before placing the iron sheets, but this will not a long time.